The GRAF One2Clean 18 Person Sewage Treatment Plant is supplied as two linked 6,500 litre Carat tanks. Splitting the volume across two standard tanks keeps the dig shallower than one large tank, which helps on sites with rock or a high water table.
It suits small developments, groups of holiday lets and busy farm sites. The two tanks sit side by side, so plan for an excavation of around 5.3 metres by 2.2 metres.
How the One2Clean Plant Works
The One2Clean 18 Person Sewage Treatment Plant treats wastewater in one tank using a simple three-stage cycle. First, sewage flows straight into the biological zone, with no pumping, and air flows through the whole tank so that bacteria start breaking down the waste.
Next, the control unit stops the air and the activated sludge settles to the bottom, leaving a layer of clear water on top. Finally, a one-piece clear water lifter draws off the treated water and the cycle starts again.
There are no pumps, moving parts or electrical parts inside the tank. Instead, the compressor and control unit sit above ground, where they are easy to reach for servicing. As a result, there is very little in the wastewater that can wear out or fail.
Key Features
- Very low energy use, from 0.63 kWh per day
- No pumps, moving parts or electrics in the tank
- Tested effluent quality of 7 mg/l BOD, 14 mg/l suspended solids and 0.5 mg/l ammonia
- Simple, compact control panel
- Quiet operation, so it suits gardens close to the house
- Lightweight Carat tank, easy to lift into place without a crane
What’s Included
- Two 6,500 litre GRAF Carat tanks with internal treatment parts fitted
- Clear water lifter and aeration system
- Air compressor and control unit
- Mini dome shafts with 150kg pedestrian telescopic lids
Options
- Traffic Telescopic Lid 3.5 Tonne, for driveways and parking areas
- Internal Pumped Outlet, for sites where the outlet cannot fall away by gravity
- External Cabinet M, for the control unit and compressor when there is no garage or outbuilding to house them
In addition, a raised outlet (fitted before dispatch), a warning beacon and a high level alarm are available on request. Please call us to add any of these to your order.
Where Can the Treated Water Go?
Treated water from the plant can usually discharge to a drainage field or, in many cases, to a ditch or stream. In England, the General Binding Rules set out when you can do this without a permit, so check the rules for your site or speak to the Environment Agency before you order. In Scotland, Wales and Northern Ireland, the local environment regulator sets the rules.
Specification
- Population: up to 18 people
- Tank: Two 6,500 litre GRAF Carat tanks
- Dimensions: 5280 x 2190 x 2390 mm (L x W x H)
- Weight: 440 kg
- Loading: Pedestrian as standard, vehicle with the traffic lid
- Tank warranty: 15 years, with a 50 year design life
- Parts warranty: 1 year from commissioning, or 3 years with an annual service
- Manufacturer: GRAF UK
Commissioning and Delivery
A GRAF-accredited engineer commissions the plant free of charge once it is installed, which also starts the warranty. We deliver the One2Clean 18 Person Sewage Treatment Plant free to UK mainland addresses. However, the plant arrives on a lorry, so you will need to be able to offload it on arrival. You can also download the drawing, data sheet and installation manual from this page.